PARADISE WHITNEY INTERCEPTOR

Frontier-Kemper recently completed Slurry Microtunneling at the Paradise Whitney Interceptor Project in Las Vegas, NV. The project consisted of:

PWI 669

  • 6,550 LF of 60-in. Flowtite FRP pipe using Slurry Microtunneling
  • (8) drives with drive lenghts ranging from 520 LF to 1,500 LF
  • Shaft depths ranging from 20 ft. to 30 ft. deep

PWI 668

  • 5,550 LF of 60-in. Flowtite FRP pipe using Slurry Microtunneling
  • (7) drives with drive lengths ranging from 200 LF to 1,050 LF




Services/Methods Performed:

FAST FACTS:

LOCATION: Las Vegas, NV

MARKET: Wastewater

OWNER: Clark County Water Reclamation District

START DATE: November 2014

END DATE: October 2015